Thursday 13 October 2016

@DDCL, @Edmonton, Hauling away old steps to the ECO center



Started a new project where the steps were written and unsafe to walk on. The old steps were hauled to the ECO Center. The ground was dug up and a base was laid for patio blocks. 3/4" Rock was added as a base over the clay for a minimum of one and a half inches then a minimum of two inches of half inch crush rock overtop. This preparation work is now completed. Next the same step pattern will be installed.
Keep moving on the steps. Added the blocks today and moving on the steps. All is progressing and should be completed today. Contact Daniel at 587-597-4228 if you have a project which needs to get completed.